Brentwood, Tennessee
Dave Van Horne
This manufacturer of conveyor systems came to us for the construction of both an open-span structure in the factory space and an attractive front office and showroom. To construct the high-bay manufacturing area, which includes a sophisticated paint process booth, we collaborated with Butler Manufacturing for pre-engineered components, designed specifically for the project.
The efficiency of the pre-engineered system allowed us to complete construction of this design/build project in just 180 days.